A pool demolition job begins with one of our team members visiting the site to assess the situation and bid the job. Our team member will give you a full consultation that covers the costs, requirements, and timeline of your pool removal.
Once you have signed off on the job, work will begin. First, we will drain the pool to the sewer system or transport the contents in a liquid truck, if necessary. Then the entire shell of the pool has to be demoed and hauled to a disposal site. All electrical, water and sewer lines must be capped. All electric components, including the one on the breaker box, must be removed. Then the excavated hole must be backfilled with clean fill dirt. The top two feet should be filled with topsoil to accommodate new landscaping. Finally, the soil is compacted to provide a firm foundation and steady footing for new construction.